23 April 2020

The project supported water supply project at Kiloleli village following successful purchase of a new water pump and new borehole installation pipes and associated accessories. Also, the implementation involved installation of new water pipes and water transmission control accessories to the water storage tank. The borehole was cleaned using pressure pump and pumping test was conducted for 24 hours. It has been established that the borehole has a depth of 135 meters and the current yield of 4400 liters/hour. The water quality was good and fit for human use including irrigation, domestic and livestock use. After realizing the suitability and availability of water, water distribution system was laid down to ensure effective and efficient irrigation system. In addition a pump house has been constructed to enhance security of the water pump.

Installed surface drip irrigation at Kiloleli farm and Constructed Pump House
Installed surface drip irrigation at Kiloleli farm and Constructed Pump House